Church Road, Croft, Skegness

24th January 2014

IMG_1073(2)

The site was occupied by two pairs of Semi-Detached Houses and we are currently undertaking Phase 1 of a Design Build Project, for the Social Housing Provider ESHA (Developments) Limited, to replace with a total of 5nr traditional two storey dwellings.

The Build comprises a pile and ring beam foundation strategy with steel cased piles circa 14m in depth and traditional brick and block walls together with Air Source Heat Pump heating source to comply with the Code for Sustainable Homes – Level 3


Duration of works: Phase 1 Build Programme 26 weeks including Demolition.


Value of Works: £500.000.00