New build by Linden Homes North on a remediated site for a new town centre development which is over looked by the Cathedral. The groundworks project largely consists of piled foundations for houses in a mix of modern designs, some with three stories, using many different materials to add character and quality to this fast selling site.
Duration of works: 2011 -2013
Value of Works: £2.4million
Our work included:
- Section 278 works and road closures
- General ground works and civils
- Retaining structures, gabion baskets
- In situ floor slab installation, code 3
- In situ ring beams
- Below ground drainage, plastic and concrete
- High end spec external finishings, Indian paving, pointed and treated surfacing
- Infrastructure works and service mains works