Minster Veterinary Centre

Construction

The project involved
demolishing the existing
building and the construction
of a new, fully operational
veterinary centre, built to
the client’s specialist
specifications, on the
existing footprint.


Duration of works: 5 months


Value of Works: £230.000.00


Our work included:


  • Stripping the foundations
  • Working with Archaeologists on foundations digs
  • Air conditioning throughout building
  • Installation of suspended ceilings
  • Air tested / pressure tested
  • Fitting of specialist lighting for operating theatres
  • X-ray rooms completely lead lined, including doors and glazing